Attention!

This site has detected that you are currently browsing using Internet Explorer 8. The Yosemite Community College District website makes use of several modern web and mobile technologies that are not compatible with versions of Microsoft Internet Explorer earlier than IE 9. This incompatibility will prevent the website from displaying properly on your computer. We recommend viewing this website using a more modern web browser. This site has been tested for compatibility with all web browsers released after 2010. For assistance viewing this website, please contact the YCCD IT Service Desk at 209-575-7900

Skip to main navigation, which will allow you to navigate to a different content area. Skip to side navigation, with links to other pages from the same office you are currently viewing. Skip to the content on this page. Skip to top navigation, with office and website directories, maps, and content information. Skip to the website search box. Skip to the links at the bottom of the page, including commonly accessed links and employee resources.
 
 

Measure E Bond Program

Manzanita Lower Level Renovation

Manzanita Lower Level ImageProject: Manzanita Lower Level Renovation

General Use: Public Access and Culinary Instruction

Square Feet: 6,000

Status: Bid Award

Architect: Lionakis

Budget Cost: $3,320,000

Construction Start: September 2016

Opening: Fall 2017

Project Goal

The food/snack bar, student operated café, and Culinary and Pastry arts classroom/labs presently occupy the lower level. Remodeling these areas will allow for more efficient use of space, modernization and growth.

Overview

Reorganize and separate the shared spaces of the Café and Culinary Arts program in the lower level of Manzanita. The existing lower level restroom facility will be upgraded and made accessible. Relocation of interior walls, plumbing, HVAC ducting, electrical outlets, lighting are likely. Relocate and reuse some of the existing food service equipment where possible without moving the exhaust systems that run through the newly completed second floor. New finishes on the walls and floors will be included.

Project Status Updates

Current Bulletin: 07/24/2017

Previous Bulletin: 07/17/2017

Earlier updates have been archived. Please contact the webmaster for access.

Links of Interest

There are no links at this time.