Attention!

This site has detected that you are currently browsing using Internet Explorer 8. The Yosemite Community College District website makes use of several modern web and mobile technologies that are not compatible with versions of Microsoft Internet Explorer earlier than IE 9. This incompatibility will prevent the website from displaying properly on your computer. We recommend viewing this website using a more modern web browser. This site has been tested for compatibility with all web browsers released after 2010. For assistance viewing this website, please contact the YCCD IT Service Desk at 209-575-7900

Skip to main navigation, which will allow you to navigate to a different content area. Skip to side navigation, with links to other pages from the same office you are currently viewing. Skip to the content on this page. Skip to top navigation, with office and website directories, maps, and content information. Skip to the website search box. Skip to the links at the bottom of the page, including commonly accessed links and employee resources.
 
 

Measure E Bond Program

Bus Service Loop

Columbia Bus Service LoopProject: Bus Service Loop

General Use: Circulation & Disabled Parking Lot

Status: Completed

Opening: October 2006

Project Goal

  • Improve safety and traffic flow in congested area of campus.
  • Provide parking for disabled students.

Overview

West of the Manzanita Building now exists the Columbia Campus Accessible Parking Lot, with a capacity of 18 spaces. The existing loop drive also serves for bus and delivery truck turn-around area. The lot, as currently exists has tight turning radii and physical barriers that pose problems for bus and truck movements. It is proposed that the existing roadway between the lot and Manzanita be widened to provide spaces for loading and unloading of two 30-person buses and one van for the disabled and to upgrade the existing vehicle parking to current accessible code.

Pedestrian Walkway - The accessible pedestrian walkway from the existing bus shelter will be extended to the south. The area now being used for accessible parking will be reconfigured to accommodate bus turn-around movements and return to the main entry road.

Disabled Parking Area - The existing spaces on the inside of the turnaround area will be re-constructed and marked to maximize disabled parking and van pool spaces and drop-offs. Access down from the lot will be by a new concrete ramp from the top of the lot to the existing foot bridge.

Central Disabled Access - When completed, this area will be utilized as a campus wide hub for drop-off and pick-up of disabled persons.

Project Status Updates

There are currently no bulletins to view.

Earlier updates have been archived. Please contact the webmaster for access.

Links of Interest

There are no links at this time.